01
Projects to assess
Levelling fills, lightweight screeds, non-structural fills and refurbishment where weight and insulation are design criteria. Each use requires qualification.
Applicators and construction companies
Implementation involves two applicator groups: building specialists and road infrastructure contractors. For each project, BLC works with the participants to define the mix, responsibilities and required checks.
01
Levelling fills, lightweight screeds, non-structural fills and refurbishment where weight and insulation are design criteria. Each use requires qualification.
02
Substrate preparation, service openings, levels, interior pumping, thicknesses, curing and coordination with other trades.
03
Allowable loads, bond, moisture before finishing and fire, acoustic and assembly-specific requirements.
01
Pavement insulation within a designed structure. Fills, bridge approaches and other works require separate qualification.
02
Earthworks, water management, platform preparation, placement, transitions, thickness control and traffic management.
03
Suitability, density, strength, protection, cover and authorisation for subsequent layers. Equipment loading is addressed in the specifications.
01
Produces under the agreement and defined procedures, with traceability and quality control.
02
Plans and carries out placement in accordance with the drawings, specifications and selected method.
03
Define the use, requirements, design and acceptance criteria.
Producer and applicator availability is confirmed by territory, application and schedule. An interested company is not presented as authorised before its status is confirmed.
Share your capabilities and the projects you would like to assess.