01
Define the requirements
Soil, traffic, climate, frost depth, water, drainage, loading and construction constraints.
Engineering firms and infrastructure owners
Assess a pavement alternative incorporating BLC using documented performance, service conditions and a like-for-like cost schedule.
01
Soil, traffic, climate, frost depth, water, drainage, loading and construction constraints.
02
A reference design and a BLC alternative meeting the same functional requirements.
03
Mix suitability, traceability, density, strength, curing and conditions for reopening.
A 300 mm BLC layer, or the 12-inch commercial reference, does not determine total excavation depth. Design must account for the entire pavement structure.
The September 2020 InnovAct study provides a 30-year pavement comparison case. Its assumptions must be updated to prepare a current estimate.
Discounted life-cycle cost decreases from C$861,541 to C$794,691 per 3.75 m lane-kilometre, about 7.8% lower, excluding excavation. Initial cost is higher in that scenario.
2020 medium-price scenario and assumptions, with a 300 mm layer. This historical result is neither a current price nor a guaranteed saving for another project.
Original reports and correspondence available on request from BLC.
Share the project type, location, dimensions and main constraints.
For a floor, fill or refurbishment, review service weight, loading, interfaces, moisture, shrinkage and fire or acoustic requirements. Pavement-insulation results are not a general building qualification.